Wednesday, September 26, 2012

Open House

This Saturday the 29th of September, we are having an open house to show off the great work that so many people did to make it possible for me to live on the lower level of our home with my disability.
Everyone is welcome to come out and take a look between 1pm and 5pm.
Our address is 204 SW 13th. St. 98604

Fence


Our fencing is finished up now. I had a few different groups of people help me set the posts, and then Pioneer Fence heard about our project and volunteered to finish it up for us. They were so easy to work with and they did a great job.

Saturday, September 8, 2012

Patio Step


My friend Tim Wells came over and helped me build a step going out of our patio door. I removed the concret step when we first got the house over seven years ago, so I could fix the rotten wood that was behind it. Jennie is so happy to have a step back.

shuters



My Dad put the black shuters on, and they realy looks nice with all the paint colors Jennie picked out. Christopher had to get in on the action, as it involved going on the roof.

Railing




Tom Harris, owner of Harris Metal Fab. built the railing for in front of the house. It is very heavy duty and I know it will hold up to my boys! After the railing was all done, Jim Morris and one of his friends came over and hauled it off and painted it and brought it back. It looks great!

Shower door

Tracy Town, with  Hamilton Glass, put in our shower door and they look and work great. Tracy put in the mirror and got us some new screens for some of the windows in the house that have never had screens before and he replaced a piece of glass in the patio door that was fogged up. Thanks for all your hard work Tracy!